| BMU Configurations change with: |
 |
Height of the Building at every 60 meters, 140 meters, 200 meters and above 300 meters. |
 |
Boom Length of the BMU either fixed or telescopic. |
 |
Perimeter Free Space availablility for BMU movement. |
 |
Load Bearing Capacity of Concrete Terrace Slab. |
 |
Levels of Automation required due to demanding or intricate elevations. |
 |
Need of Articulation Platforms. |